|
2010 Exploration Plans
2010 Exploration Plans Include :
Mechanical Stripping Using D5 Bulldozer with Dumptruck and Loader
Pressure Washing Stripped Area Using Honda Water Pump
Sampling 1,000 Tons From Reserve Pile
Creating Access To All Area's of over 2,500 acres of Claims
Locating Prior DD Holes on Claims
Misc. Mapping (Stripped Area's)
2010 Camp and Equipment :
2 Campers
D5 Bulldozer / John Deere Loader
2 Quads / Boat / Motorbikes
Many Snowmobiles
4' by 4' Screen Deck (Washes and seperates Material)
Falcon ICON Concentrator
Shaker Table / Gold Wheel
RC1 Crushers (Keene)
2010 Shotgun Exploration Crew Includes :
Murray Fairnington - Operator / Foreman
Larry Oveson - Exploration Manager
Scott Chalupsky - Prospecting Assisstant
Joel Burghardt - Prospecting Assisstant
Matt Wensley - Prospecting Assisstant
|